Question

Timing the work elements using the snap-back method requires:

A) the worker to perform each job element as quickly as possible.

B) a larger sample size than using the continuous method.

C) the use of two stopwatches.

D) a smaller sample size than using the continuous method.

Answer

This answer is hidden. It contains 64 characters.