Question

The master production schedule (MPS) for two products, A and B, is shown below. To manufacture item A, two units of component C are required. To manufacture item B, four units of component C are required. The inventory balance for C is 10 units at the start of week 1. Using this information, determine the gross requirements for component C to start week 1.

MPS Week 1
Product A 15
Product B 2
A. 15 units
B. 28 units
C. 38 units
D. 48 units

Answer