Refer to the data above. What are the overhead rates used to apply material handling (MH) and storage costs (SC) using activity-based costing?

A. MH $300/batch; SC $2.73/unit.

B. MH $300/batch; SC $.20/lb.

C. MH $525/batch; SC $.205/unit.

D. MH $700/batch; SC $.205/lb.

E. MH $700/batch; SC $8.20/lb.