Question

For the net present value (NPV) criteria, a project is acceptable if NPV is ________, while for the profitability index a project is acceptable if PI is ________.
A) greater than zero; greater than the required return
B) greater than or equal to zero; greater than zero
C) greater than one; greater than or equal to one
D) greater than or equal to zero; greater than or equal to one