Question

A rectified inspection plan requires that:

A) a rejected lot be returned to the supplier.

B) a rejected lot be subjected to 100% inspection.

C) a sample with too many defectives be returned to the lot for mixing and resampling.

D) all units in the sample be returned to the lot if it is rejected.

Answer

This answer is hidden. It contains 70 characters.