Question

A manufacturer produces aluminum cans internally rather than purchasing them and uses the economic production lot size equation to govern this process. The length of time that the aluminum can batch runs is given by the equation ________ and the time between the start of one batch of cans to the next is found by the equation ________.

Answer

This answer is hidden. It contains 86 characters.