Question

A manufacturer enjoys both a Cpk and a CP = 2.0. How high does the process mean have to drift (in number of standard deviations) away from target in order to result in a 1% chance of making a product out of specification? Illustrate this situation (both before shift and after shift) with a diagram.

Answer

This answer is hidden. It contains 1230 characters.